Verification Before Completion

Use when about to claim work is complete, fixed, or passing, before committing or creating PRs - requires running verification commands and confirming output before making any success claims; evidence before assertions always

73OpxScoreProvisional
Community resultNot enough feedback0 votes
Model evidenceNo verified testsModel fit pending

Score breakdown

Estimated from the available content and source signals.

Provisional
Documentation77
Practical value68
Evidence63
Source trust88

Model compatibility

Inferred fit is not the same as a recorded hands-on test.

ClaudeuntestedNo model-specific signal or recorded compatibility test was found.
ChatGPTuntestedNo model-specific signal or recorded compatibility test was found.
GeminiuntestedNo model-specific signal or recorded compatibility test was found.
CopilotuntestedNo model-specific signal or recorded compatibility test was found.
LlamauntestedNo model-specific signal or recorded compatibility test was found.
PerplexityuntestedNo model-specific signal or recorded compatibility test was found.
MistraluntestedNo model-specific signal or recorded compatibility test was found.
GrokuntestedNo model-specific signal or recorded compatibility test was found.

Overview

Verification Before Completion

Overview

Core principle: Evidence before claims, always.

Violating the letter of this rule is violating the spirit of this rule.

The Iron Law

NO COMPLETION CLAIMS WITHOUT FRESH VERIFICATION EVIDENCE

If you haven't run the verification command in this message, you cannot claim it passes.

The Gate Function

BEFORE claiming any status or expressing satisfaction:

1. IDENTIFY: What command proves this claim?
2. RUN: Execute the FULL command (fresh, complete)
3. READ: Full output, check exit code, count failures
4. VERIFY: Does output confirm the claim?
   - If NO: State actual status with evidence
   - If YES: State claim WITH evidence
5. ONLY THEN: Make the claim

Skip any step = lying, not verifying

Common Failures

ClaimRequiresNot Sufficient
Tests passTest command output: 0 failuresPrevious run, "should pass"
Linter cleanLinter output: 0 errorsPartial check, extrapolation
Build succeedsBuild command: exit 0Linter passing, logs look good
Bug fixedTest original symptom: passesCode changed, assumed fixed
Regression test worksRed-green cycle verifiedTest passes once
Agent completedVCS diff shows changesAgent reports "success"
Requirements metLine-by-line checklistTests passing

Red Flags - STOP

  • Using "should", "probably", "seems to"
  • Expressing satisfaction before verification ("Great!", "Perfect!", "Done!", etc.)
  • About to commit/push/PR without verification
  • Trusting agent success reports
  • Relying on partial verification
  • Thinking "just this once"
  • Tired and wanting work over
  • ANY wording implying success without having run verification

Rationalization Prevention

ExcuseReality
"Should work now"RUN the verification
"I'm confident"Confidence ≠ evidence
"Just this once"No exceptions
"Linter passed"Linter ≠ compiler
"Agent said success"Verify independently
"I'm tired"Exhaustion ≠ excuse
"Partial check is enough"Partial proves nothing
"Different words so rule doesn't apply"Spirit over letter

Key Patterns

Tests:

✅ [Run test command] [See: 34/34 pass] "All tests pass"
❌ "Should pass now" / "Looks correct"

Regression tests (TDD Red-Green):

✅ Write → Run (pass) → Revert fix → Run (MUST FAIL) → Restore → Run (pass)
❌ "I've written a regression test" (without red-green verification)

Build:

✅ [Run build] [See: exit 0] "Build passes"
❌ "Linter passed" (linter doesn't check compilation)

Requirements:

✅ Re-read plan → Create checklist → Verify each → Report gaps or completion
❌ "Tests pass, phase complete"

Agent delegation:

✅ Agent reports success → Check VCS diff → Verify changes → Report actual state
❌ Trust agent report

When To Apply

ALWAYS before:

  • ANY variation of success/completion claims
  • ANY expression of satisfaction
  • ANY positive statement about work state
  • Committing, PR creation, task completion
  • Moving to next task
  • Delegating to agents

Rule applies to:

  • Exact phrases
  • Paraphrases and synonyms
  • Implications of success
  • ANY communication suggesting completion/correctness

Best for

  • Use Verification Before Completion when this documented workflow matches the task.

Tips and best practices

  • Review the source instructions and adapt inputs before running the workflow.

What This Skill Can Do

AI-generated examples showing real capabilities

Was this skill useful?

Be the first to share a result.

Related skills